Faccombe: Vestas V39 Gearbox Swap

Spectrum were approached by the owners of a Vestas V39, located on the Faccombe estate in Hampshire. The client had purchased a refurbished gearbox and arranged shipment to site. Our team was tasked with removing the existing gearbox from the nacelle, and replacing this with the clients new gearbox.

The procedure was time critical, as the old gearbox had to be removed and stuffed in the same vehicle as the new gearbox was arriving. This had to be done on the same day.

PHOTO-2018-10-11-16-09-17 2.jpg

Our clients were very happy with our efficiency and dedication. If you are looking for professional servicing for your wind turbine, get in touch with us.

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s